Kitchen Chaos…

Our landlord has offered that we could have a new kitchen for the flat, so we (stupidly?) accepted and have been boycotted in our work for nearly a month now…

Our flat, which we lovingly call the tent, is rather tiny. Peter has been living here for about 15 years, 4 of which I lived with him permanently. 15 was also about the age of the kitchen and its inventory when Peter first moved in and it had not been replaced since then. Peter had re-decorated the kitchen beautifully, though. It was painted in a deep blue and he had replaced all the cupboard doors with straw roller-shutters. He also put frames with Asian embroidery and good luck knots on the walls and kept his beautifully diverse basket collection on the top of the shelves. This plus some of his antique kitchen tools gave the kitchen a beautiful look and feel.

Though it was always a bit dark to work in there and there was not enough storage space, so it looked always stuffed and cluttered… In the last few years stuff also started to rot… Our tabs started to leak and could not be replaced because they were “non-standard”, as this used to be a chemist shop before it was turned into a disabled flat, when the previous tenant moved in 30 years ago… The tabs were only repaired very clumsily and kept leaking on the sides, which made it more difficult to keep mold away from the rubber seals… Also our window sill, which was not protected from kitchen moisture started to get cracks and allowed half a colony of ants to move into our kitchen… So stuff got a bit complicated, as we don’t just believe in using poison and killing them and rather decided to let them be and work around them as far as possible. In winter they would hibernate anyway and leave us alone… This worked pretty well for the last 3 years, but this summer the ants went crazy, the population grew rapidly and we had to use every non-chemical thing we could come up with to stop them, as it got nearly impossible to make a cup of tea without having at least a couple of dead ants swimming inside the cup…

This was the point when we finally got a call, that we had reached the top of the waiting list for a new kitchen. So of course we accepted, as it would also allow us to maybe finally have our own washing machine and being no longer dependent on either the launderette (before Covid) or washing by hand in a tiny basin (since Covid). We picked the colours and the cupboards, decided to keep everything bright and reflective, so that we would in future have less trouble working in there and so we cleared the whole kitchen, stacked everything in there in the remaining rooms and the corridor. They reassured us that it would only take them 3 weeks, so we were happy enough to clutter up our tiny flat if we would soon get a new and better kitchen with fewer ants, more brightness and light, fully functioning tabs and most of all: a washing machine…

4 weeks ago the works finally started. A friendly chap called Simon dismantled the old cupboards, took them to pieces and threw them into a big rubbish bag, which was later collected by a huge crane that took it to the recycling facilities. Dismantling took about two days and was very noisy, so was the hammer-drill of the electricians later… We struggled a lot with the noise ourselves, but then also the woman from the post office next door came in and complained… We asked her to complain to the landlord, as we had hoped they had informed the neighbours, but they obviously hadn’t… Then nothing happened for 5 days, till the electricians came back in week 2. Then a plumber came to disconnect the sink and a gas person to disconnect our hob. Then another 5 days nothing happened and we started to wonder how long this whole process would actually take. At the same time people kept contradicting themselves when what would happen and did not come around when it was announced and came in when they had before told us, we would not need to expect anybody… We wanted to be able to leave the flat, so asked them to install a key lock, so that they could leave themselves in if we were out…

Stupidly they would never use it, only if we left during the day and asked them to lock the flat after we had left. But one actually used our normal key and posted it through the letter box slit afterwards, which blocked the whole door, so I had trouble getting in… Another problem was, that Covid rules and hygiene in general were not much obeyed by the otherwise lovely people… Not washing hands after using our loo and standing up doing so was not easy to stand… I ended up saying nothing and just wiped the loo seat and other surfaces whenever one of them was using our bathroom…

Nothing much more happened in week 2. In week 3 the plasterer did his job, somebody did the first layer of the floor and the painter came in. As nobody came in till the end of the week (I felt like cooking lemonade out of the lemons they threw in our way), I thought I could use the echo-y acoustics of the empty kitchen to record some music in there… Just on the day I wanted to do that the cupboards and the new sink got delivered and were chucked into the room… The echo was gone… Damn… It had been 3 weeks now and we were still without a functioning kitchen. By now we thought we could put all the stacked away things back in there and free space in our flat up to be able to work again. By now Peter had been waiting for me to take more photographs for the book and I had promised to record some vocals for a song Harald had made. Peter had also interrupted the work on his book, as he did not manage to focus with people coming in and out all the time (when not expected) and the degree of noise. So we were already quite impatient to get on with work… I was not even able to do much work in the household, as we had chairs stacked in the bathroom, which would only allow me to dry maybe a couple of things at the same time after handwashing and nearly everything else was blocked, too… We also needed to use the basin in the bathroom for doing our washing up… We honestly felt pretty stuck and other bureaucratic issues needed to be solved at the same time, which stressed us out even more and we ended up arguing…

Luckily in week 4 things started speeding up again. First Simon and a colleague assembled the cupboards and cut the worktop to size, then the plumber came back and attached our new sink. Sadly we noticed that they had forgotten to put a socket for the new washing machine space in place, so the electricians needed to return. We went out twice to the Cafe nearby, so that we could escape the noise. This was a bit of a relief. We also got a new radiator installed and the painter returned to finish off some work… Stupidly when the gas guy came back to reattach our hob, he suddenly told us our old hob was no longer matching the safety standards and that we need to buy a new one. So we ordered one very quickly (we luckily had enough money) and asked a lady from the kitchen company to pick it up for us. Luckily the painter was kind enough to dispose of our old hob for us… So by now we have a functioning hob and a functioning sink. Also the tiles were delivered, so work can continue in week 5, if they have a tiler available… But we would not be surprised if the work would go into week 6… We try to be patient and just hope we can go back to our own work some time soon before losing our minds…

What is still left to do is apart from the tiling, the 2nd floor layer, a new lighting solution, a new window sill covering, the fixings, the re-installation of our oven and us ordering a washing machine, which then will also be plumbed into our new kitchen. Only after all of this is done, we can finally have the space in our flat back and restock the kitchen with all the crockery, cuttlery, kitchen tools and machines, the fridge-freezer, our food and finally cook and bake again. For the mean time we have our toaster, kettle and microwave installed in the living room/office/workshop and the fridge-freezer is standing in the corridor…

We hope life goes soon back to normal after this. There are more things ahead, like Peter finally getting his electric mobility scooter and me wanting to build a tambura-chord. Also Covid is easing off enough by now, so that exhibitions, workshops and concerts are maybe possible again. Heather and me may also have our first actual session with our harp-soundbaths. Plus there is another rebellion ahead and maybe a last chance to make people in power realise that we have to change the system now to keep the whole of nature including ourselves alive and thriving on this planet…

Thank you for reading, I soon hope to be back with less boring stories… 🙂

Love,

Syl